Monday, 20 March 2017 15:02

Stack remove and tile over

Remove a stack that was leaking the customer had uesd other roofers to repair the leak. Stacks that are unused are best removed as it's impossible to keep the water from getting through as most stacks do not have a damp proof as the last photo shows. 

 

A scaffold was needed to replace the barge boards on the gable. This was above a extension so we build the scaffold ontop of the roof. The repairs were carried out in Ashton Tameside. We have our own scaffold and prefer to use our own so when it comes down we can inspect for any damage to the roof so repairs can be completed before we leave. 

Monday, 20 March 2017 09:10

Slipped slate repair Tameside

Fix back the slipped slates to the roof and point under the slates 

Monday, 20 March 2017 08:18

Screw fix down ridge tiles

We cemented and screw fixed the roof tiles down on hip so they can never blow from the roof again. 

Monday, 20 March 2017 08:09

Factory gutter repairs Stalybridge

Set up scaffold to factory gutter and install a new outlet and hopper to clear the rainwater fast in heavy rain. Stalybridge